The Department of state architectural and construction control of Almaty region conducted 5 unscheduled inspections in 2020 and issued 6 prescriptions.
According to the results of which 36 administrative materials were initiated, of which 12 administrative materials were sent to specialized inter-district administrative and district courts of the region for making a procedural decision. According to article 463 part 1 - 6 subjects, according to the article 319-3 subject, under article 462 part 3 – 2 of the subject, for 312 h a 2 – 1 subject.
The Office of the state architectural and construction control of Almaty region reviewed 24 administrative materials in the amount of 9,570,110 tenge, collected 3,101,670 tenge.
Of them under the articles of the administrative Code:
n / a Article
Administrative Code Sanction
articles Quantity Amount
1 312ch1 For performing pre-design, design, construction and installation works, in violation of the requirements of legislation and state regulations in the field of architectural and construction activities 4 1 325 500
2 323 Operation of facilities and complexes that have not been put into operation in accordance with the established procedure, except for the requirements established by technical regulations. 3 119 295
3 316h. 1 Construction (reconstruction, restoration, expansion, technical re-equipment, modernization, major repairs) of objects and their complexes without design (design and estimate)documentation or design (design and estimate) documentation that has not passed due examination 7 2 863 080
4 318 Violation of the established procedure for acceptance and commissioning of facilities and complexes, except for the requirements established by technical regulations7 1 66 275
5 321 implementation of construction without technical and author's supervision 9 5 195 960
Total: 24 9,570,110
1 463h.1 For performing actions without sending a notification of the beginning of construction and installation works 6 172 225
2 319 For illegal construction 3 39 765
3 312m2 Actions provided for by the first part of this article, committed repeatedly within a year after the imposition of an administrative penalty. 1 0
4 462ch3 non-Fulfillment or improper fulfillment of legal requirements or instructions, representations, resolutions issued by state control and supervision bodies( officials), officials of state bodies within their competence, except for the cases provided for in articles 162 and 227 of this Code. 2 530 000
Total: 12/36 741 990/
10 312 100
Information
about the work done by the licensing and certification Department
Almaty region as of April 03, 2020
Number of license applications received: 168 of them:
- Satisfied: 38
- Rejected: 88 (of which: 51-not meeting the qualification requirements, 37-due to incomplete documents)
- Under consideration - 5
18 licenses were issued and 19 were reissued ( with category assignment – 1, change of name and legal address -18, reorganization - 0).
Construction and installation works 28 of them:
I category-3 (issued-2, reissued-1);
II category-12 (issued-5, reissued-7);
III category-13 (issued-5, reissued-8);
6 project activities, including:
I category-0 (issued-0, reissued-0);
II category-5 (issued-3, reissued-2);
III category-1 (issued-1, reissued-0);
For survey activities-3 (issued-2, reissued-1)
Additional types – 1
For the entire period, the total number of licenses issued is 3,745, of which,
For construction and installation works 2586, of which:
Category I-133;
Category II-6;
Category III-1837;
For project activities 1058 of them:
Category I-51;
Category II-276;
Category III – 731;
For survey activities-101.
2. the Number of applications received for obtaining certificates for expert work and engineering services.
In total-69 applications, of which 42 were admitted to testing, 24 were not admitted to testing, and 3 were rejected due to incomplete documents
Certified-34, of which:
Technical supervision - 15
Technical supervision of objects of the first level of responsibility in terms of-load-bearing and enclosing structures-0
Technical supervision of objects of the first level of responsibility in the part – engineering networks-0
Technical supervision of objects of the first level of responsibility in terms of-technological equipment-0
Technical supervision of objects of the second and third levels of responsibility in the part-bearing and enclosing structures -5
Technical supervision of objects of the second and third levels of responsibility in the part – engineering networks-7
Technical supervision of objects of the second and third levels of responsibility in terms of-technological equipment-3
Technical inspection of reliability and stability of buildings and structures – 4
Author's supervision - 8
Author's supervision of objects of the first level of responsibility in terms of architecture-0
Author's supervision of objects of the first level of responsibility in terms of load-bearing and enclosing structures – 2
Author's supervision of objects of the second and third levels of responsibility in terms of architecture – 3
Author's supervision of objects of the second and third levels of responsibility in terms of load-bearing and enclosing structures - 3
Expertise of urban planning, pre-design and design estimates-7
- engineering networks and systems-0
- structural part-2
- technological part-1
- urban planning-0
- architecture-2
- special project sections-2
- environmental part-0
- pre-project documentation-0
- sanitary and epidemiological welfare of the population-0
No-show for testing – 6
Not certified-2.
For the entire period, the total number of certificates issued - 1462, including,
Technical supervision - 1153:
Author's supervision-54:
Expertise of urban planning, pre-design and design estimates-176
Technical inspection of buildings and structures - 79.
With the beginning of the year number of suspended certificates – 7 (Kardanov B. K. – technical supervision on objects of the first level of responsibility - in terms of engineering networks; Kozhakhmetov S. M. - technical supervision on objects of the second and third levels of responsibility - in terms of bearing and enclosing structures; Kazbekov B. K. - technical supervision on objects of the second and third levels of responsibility - in terms of bearing and enclosing structures; Kvass I. A. - technical supervision on objects of the second and third levels of responsibility - in terms of bearing and enclosing structures; the Kazhiev A. technical supervision on objects of the first level of responsibility – in terms of bearing and enclosing structures; Karabaev S. T. - technical supervision on objects of the second and third levels of responsibility - in terms of bearing and enclosing structures; Rope, S. A., technical supervision on objects of the first level of responsibility in terms of technological level).
List of accredited organizations for project management in the field of architecture, urban planning and construction:
1. JSC "Alatau" for the development of the Almaty region (prod. 10.11.2018)
2. UKS LLP (extended on 15.02.2019)
3. LLP "Zhetysu-regional gas" (was selling 20.05.2019 g)
4. LLP "Arsenault»
5. PMG LLP
6. Branch of Project-development LLC»