"Reconstruction of the blocking dam for the accumulation of flood and meltwater on the Belbulak Uzak pond of the Batyrsky village of Raiymbek district"
The customer of the State Institution "Construction Management of Almaty region"
Contractor LLP "G.S.G.Vysotnik", (Head Shaker Bakyt)
Estimated cost of construction 389 600.0 thousand tenge
The facility has been put into operation since 01.11.2022. Work is underway to legalize the object.