Akim of Almaty Bakhytzhan Sagintayev, during a working detour, got acquainted with the progress of construction of engineering networks and projects for road repair.
In his Instagram account, the akim of the city, B. Sagintayev, spoke about the working detour of residential areas of the Medeu district, where the construction of engineering infrastructure is underway.
“In the microdistrict Kolsay, the sewerage network will be commissioned after solving the issue with the source - water supply. The resulting sinkholes will be covered with inert materials. The issue of determining a site or premises for a medical outpatient clinic is being resolved, ”wrote B. Sagintayev.
Due to the chaotic development, there are practically no corridors for engineering networks in the Kensai dacha area. In this regard, options for providing residents with drinking water will be studied.
In md. Duman last year, after a downtime, work was resumed on the construction of 19 km of water supply networks and 25.5 km of sewerage. Now they are undergoing tests and elimination of defects, which have also been pointed out by local residents. After that, the repair of 27.4 km of roads along 53 streets will begin.
The akim of Almaty also got acquainted with the construction project in the Duman microdistrict, a medical outpatient clinic for 200 visits. During his stop to the Shukhov square, repaired within the framework of the "Employment Roadmap", B. Sagintayev ordered to prohibit the passage of cars through the green zone and to improve the adjacent areas.
In addition, the akim of the city examined the House of Social Services, where repair and finishing works are still underway.