
The reconstruction of the present fountains is planned to make in front of the National Library, in front of the hotel «Zhetysu», in front of the hotels at the crossing of the streets Ablaikhan/Shevchenko and the others. The construction of new fountains will be done in Abay avenue, Nazarbayev, Abylaikhan avenues, and also between the streets of Gogol, Zhibek zholy, Mametova,Raiymbek.
There will also be the traditional fountains with the swimming- pools and the «dry fountain». There will be used the latest new technologies with the reversed water supply, the shape managing system, the longitude of flowing. There will be installed the illumination of different spotlights with the halogen lamps and the floating lights.
It should be mentioned that in this year there will be renewed a number of avenues in the city, besides the ready- made modernized streets: Panfilov, Zhibek zholy, Gogol, Kabanbay batyr, Baiseitov, Tolebayev and the «Astana» area.

By the principle of polycentricism, there are being made the improvements in all the districts of the city. If last year 455 yards were repaired, now in 2018 years there would be renewed the other 585 Almaty yards.
In general, in last year in the city there were built and repaired 180 km roads and 700 km engineering networks. A number of traffic interchanges are being built and the diggings of main streets are being done. In this year it is planned to repair 157 streets for 155 km long and 30 km of pedestrian sidewalks.