Report on the work done for 2019 on the State Enterprise "Ozen Zhylu"

Report on the work done for 2019 on the State Enterprise "Ozen Zhylu"

At the facilities of the state municipal enterprise "Ozen Zhylu" of Zhanaozen, measures have been developed and approved by the Department of Housing and Communal Services and housing inspection of the city of Zhanaozen to prepare for the autumn-winter period of 2019-2020.

On the basis of these approved measures, regular repair and scheduled preventive work has been carried out.

In particular, preparatory work was carried out for the winter in the boiler complex of the central boiler house and mini CHP, the steam boiler room of the Uzen railway station, the boiler room of the village of Kyzylsay and autonomous boiler houses in the amount of 35 pieces.

Stoppers, seals for water, electric, gas networks were installed on all stopped boiler houses and were on conservation before the heating season.

 

According to the Central boiler house and steam boilers of the mini CHP:

1. the interior walls of the building were painted with a central boiler room with an area of 1824 m2.

at small thermal power plants-25-24-380- the current repair of GMO steam boilers has been carried out. 100% completed.

3.A high-voltage electric cable is installed on the Central Committee smoke pumps No. 2 and the mains pump No. 5.

4. 275 tons of technical salt were collected for the central boiler house.

for min CHP ø50÷ ø150 mm-20 pcs.;

In the central boiler room ø50 mm÷ø150 mm-15 pieces;

valves and cooling tower network replaced pipe 100 m-ø100 mm.

6.The valves of the ROE and BROU installations have been checked and repaired.

 

 

 

For heating mini boilers

 

in total, there are 35 subordinate institutions (including 24 units at educational facilities; 4 units at social facilities; 4 units at health facilities; 3 units in the multi-storey residential sector.) the boilers in the heating boilers were washed and put up for conservation. Work has been carried out to install plugs on gas pipelines.

 

2. installation of automation systems, fire and gas alarm systems.Control of the automation system by means of an integrated coordination system. In total – 32 pieces-100% executed.

By external heating networks:

To date, the length of outdoor heating networks transporting hot water and heat is 192.32 km, including trunk pipes - 48 km, distribution pipes – 144.32 km. The external heating system at the railway station is 2.4 km, the external heating system in the village of Kyzylsai is 5.4 km.
repair of external heating networks-1.8 km-is 100% completed.

 


Residential buildings by basement networks:

Residential houses of sanitary maintenance of the State Enterprise "Ozenzhylu" :

A total of 242 residential buildings are provided with heat through a centralized heating system. In the mkr. "Rauan" -10 the house receives heating from an autonomous boiler room.

Also, measures have been developed to prepare for the heating season of residential buildings in these neighborhoods.

 


An audit was carried out, the audit of the shut-off valves at 242 residential entrances (input) was 100% completed.

Including -104 pieces of faulty valves replaced.

They follow:

"Shanyrak " -ø50mm-10 pcs,

Mkr. "Shugyla" - ø50mm -10 pcs.,

Mkr. "Koktem" - ø50mm-20 pcs., ø80mm-44 pcs.,

Mkr. "Orken" - ø50mm-10 pcs.

Currently, work has already begun on preparing for the 2019-2020 heating season for the residential buildings of these microdistricts. In particular: an audit (inspection) of the heating networks of engineering networks in the basements of all 242 residential buildings was carried out, hydropneumatic tests were carried out.

An audit was carried out, the audit of the shut-off valves at 242 residential entrances (input) was 100% completed.

Replaced shut-off valves at the entrances of residential buildings-104 pcs.100% completed.

Housing and communal services mekemesimen bekitilgen is-shara boyynsha,zhumystardyn oryndalysy - 100 % kuraydy.

According to the measures approved by the housing and communal services, the performance of works is 100%.

 

GKP "Ozen Zhylu" successfully started the heating season 2019-2020 on October 15, 2019

years.

For thermal boilers:

The total number of all heating boilers in the city is 42, including the main ones - 4, which include a Central boiler room and a Mini CHP, a hospital boiler room, a boiler room of the village of Kyzylsay and a boiler room of the railway station Uzen provides heating to residential buildings of the city and the village of Kyzylsay and the remaining 38 autonomous autonomous boiler rooms outside the city of the kindergarten school.Their temperature corresponds to the approved schedule.

The central boiler house provides 90% of the city's heating and hot water supply. Currently, 2 blocks of KVGM-58.2-150 boilers generate heat.

The average daily temperature T1 is 84 ° C, T2 is 63 ° C, and the pressure parameter P1 is 8.8 kgf / cm2; P2 was 1.8 kgf /cm2.

By external heating networks:

Currently, the length of external heating networks is 192.32 km. The outdoor 4-pipe heating system works smoothly.

The round-the-clock dispatch center accepts and executes daily requests.

 


Residential buildings indoor heating networks:

State Enterprise "Ozen Zhylu" to perform plumbing maintenance of residential buildings: Total: 252 houses, of which 233 houses are provided with centralized heating: Shanyrak-52, Shugyla-65, Samal a-42; Koktemsky microdistrict-43; Orken microdistrict-31;

Currently, the houses in these neighborhoods are fully equipped.

From the external heating networks of the GKP "Uzen Zhylu" to the entrance part of the apartment, that is, to the distribution boundary, the central heating boiler works in accordance with the approved schedule.

We consider the above problem to be very relevant, because since 1996, the internal utilities system of multi-storey residential buildings has not been overhauled, their wear and tear has ended, and the level of accidents was high.

 


However, in preparation for the heating season, a number of works were carried out: pipes with diameters of 32, 40, 57 mm and 8750 m were replaced at 58 entrances (basements) in 43 houses throughout the city.

The second most important problem was pumping pumps in which the hydraulic system of internal engineering systems was broken during the 2018-2019 heating season, such as pumps mkr Shanyrak-8; pumps mkr Samal-3, mkr Koktem - 37 units, mkr Orken - 46 units; in social facilities of the city - 10 units. This year they were disconnected from the network to restore the hydraulic regime.

Currently, work is underway to restore the hydraulic regime, and a pump with 4 pumps has been put into operation from the central heating boiler.

In microdistricts near the Central Boiler house, washers are carried out, in particular, 55,57,58,56,46,47,48 residential buildings in the Koktem microdistrict and the Orken microdistrict 62,68,69,70, 71,73,74,75 we are working on bringing heat to the most extreme blocks of houses.

However, the actual problems remain, due to corrosion caused by corrosion of the interior of the apartment and the heat exchanger, malfunctions occur, which are quickly eliminated and heating is provided.