
For the prevention of spring floods, approved by Deputy akim of the Abai region Garikov D. A. On February 29, 2024, a regional working group arrived in our district, which checked how much preparation was being carried out and what measures were being taken to prevent spring floods in 2024 in the district.
In particular, they inspected and checked the snow removal works inside the village, the condition of special equipment, the enclosing dam built to drain meltwater, the number of bags, inert materials, an evacuation center for the evacuation of the population and the plan of spring events.
The akim of the district personally received the working group and familiarized with the state and preparations for the upcoming flood period.
Also, the deputy akim of the district K. Zhangaliev, the head of the emergency department of the district S. Suleimenov and the chief inspector for emergency situations of the akim of the district J. Bektoleuuly, together with the working group, conducted an inspection and showed the progress of intra-district flood prevention training.
This regional working group gave a satisfactory assessment of the ongoing measures for the prevention of spring floods in the area and the course of preparation, shared its proposals.