Report of the Akim of the Abay district M. Smagulov on the work done for 9 months of 2024 in the Abay district

The report given by Abai district mayor M. Smagulov to the residents of the district

 

9 months of 2024 of Abay district

predictive indicators of socio-economic development

 

Rs

Index name

Size, index

1

Agriculture

The total output of agricultural products is 34,888.5 mln. tenge, index is 105.0 percent.

In 8 months, agricultural structures and private owners produced 14,202.7 tons of live weight meat, or 106.4 percent compared to last year, milk - 18,960.8 tons, or 82.8 percent, eggs - 947,200 pieces, and 100 was 8 percent.

According to the results of 8 months, there are 172,420 head of sheep and goats, 103,567 head of cattle, and 71,041 head of horses. (Sheep and goats increased by 135.6 percent, cattle increased by 154.3 percent, and horses decreased by 80.2 percent).

2

Residential house

In January-September, 5,400 square meters of residential construction were built in the private sector, with a growth rate of 114.6 percent.

4,000.0 mln. tenge construction and installation works were carried out, it was 102.0 percent compared to last year.

3

Employment

 There are 433 unemployed persons registered with the authorized bodies for employment. 314 people got permanent jobs. 170 people were involved in public work.

4

Small business

The number of working small and medium-sized enterprises is 1,481 units, 100.0 percent compared to last year.

 

The land area is 2 million 9 thousand 391 hectares.

Rs

Index name

Size, index

1

Land claims for the benefit of agricultural structures

1,275,193 hectares

The land used by agricultural structures is 1,275,193.0 ha, the land of settlements is 175,241.0 ha, the land not intended for transport, communication, production, defense and other agricultural purposes is 1446.0 ha, the land of specially protected natural territory is 6400.0 ha. the land of the forest reserve is 8522.0 hectares, the district land reserve is 535 343.0 ha.

2

Lands returned to the state

5474.9609 hectares

Plan for 2024: 7000 hectares.

 

Demarcation of the borders (limits) of settlements of Abai district

There are 11 settlements in 9 rural districts in the territory of Abay district. The total area of the district is 2,009,391.0 hectares, including: 1,275,508 hectares of land used by agricultural structures, 275,952.42 hectares of settlement land, 1,446.0 hectares of land not intended for transport, communication, production, defense and other agricultural purposes. , 6400.0 hectares of specially protected natural territory, 8522.0 hectares of forest reserves, 434,632 hectares of district land reserves.

No. 132 of October 26, 2023 of Abay district administration and No. 9/11-VIII of October 24, 2023 of Abay district maslikhat and joint resolution No. 55 of March 28, 2024 of Abay district administration and No. 14/7 of March 28, 2024 of Abai district maslikhat According to decision VIII "Joint decision on setting the borders (limits) of settlements of Abai district was issued, the borders of settlements of 9 rural districts and plots of land in pastures were established and approved as follows.

3 plots of land in Kundizdy rural district, total area 24,086.6 hectares.

3 plots of land in Arhat rural district, the total area is 29,014.58 hectares.

2 plots of land in Kaskabulak rural district, the total area is 43,002.74 hectares.

5 plots of land in Sarzhal rural district, the total area is 33,723.4 hectares.

2 plots of land in Medeu rural district, the total area is 9875.4 hectares.

There are 3 plots of land in the Kengirbai bi rural district, the total area of which is 17,304.7 hectares.

There are 9 plots of land in the Karaul rural district, the total area of which is 50,010.0 hectares.

7 plots of land in Kokbay rural district, total area 48,106.0 hectares.

5 plots of land in Tokhtamys rural district, total area 20,829.0 hectares.

The area of the settlement was 175,241.0 hectares, 71,730.0 hectares were added to 3 villages, and the total area of the settlement was 277,448.8.

The main industry of our district is agriculture, including animal husbandry.

As of 01.09.2024, 103,567 cattle, 172,420 sheep, goats and 71,041 horses were registered in Abay district.

The number of farms engaged in animal husbandry is 537.

There are 44 breeding farms in the district, including 22 sheep, 21 cattle, and 1 horse.

In 8 months this year:

produced meat - 14.2 tons

milk - 18.9 tons

 

The number of vehicles registered in the district

 

682

437 tractors, 199 trailers, 46 road construction equipment. 12 tractors were purchased for leasing and own funds for 130 million 094 thousand tenge and 7 auxiliary tractors for 23 million 110 thousand tenge.

The total is 153 mln. Equipment was purchased for 204 thousand tenge.

   

The number of small and medium-sized enterprises registered in the region is 1468 units.

As of September 2024, 1,392 small and medium-sized business entities are operating in the region, 67 of them are grocery stores.

Since the beginning of the year, 165 raids were conducted by 10 monitoring groups.

Since the beginning of the year, 3 fairs have been held in Karaul, the district center, in order to stabilize prices .

At the fair, crops of "ARDAGER", meat and dairy products from villages, pure honey from Borodulikha region, barley, bran feed from "Ai-Ar" LLP, various types of vegetables (potatoes, onions, carrots, cabbage) from "Agrofirma prirechnoe" LLP. and egg products were on sale.

Agricultural fair of Abay district was held twice in "Severny" SLO.

Beef meat - 4.0 tons, horse meat - 4.0 tons, sheep meat - 0.5 tons.

On September 28-29 of this year, another regional fair of producers of agricultural goods was held in the capital, opposite the "Kazanat" hippodrome, at the address 1, Karkaraly highway.

A total of 5 farms and 4 private entrepreneurs from our region participated in this fair. A total of 12 tons of meat (horse, cow and sheep), 4.5 tons of kumyz and ice cream made from kumyz were brought and traded at the fair.

 

 

 

VETERINARY

The epizootic situation in the region is stable.

Rs

A type of farm animal

 

Tested for brucellosis

( 2024 years )

 

The one that gave a positive result

Indicator, percentage

 

1

horned cattle

86386 heads

(per year according to the plan

2 times)

75 heads

0.08%

 

2

sheep and goats

139624 heads

(per year according to the plan

2 times)

0

0%

 

 

Disinfection works:

Rs

Object number

(year 2024)

Territory

 

1

25

16832 square meters

 

 

Vaccination against brucellosis:

Rs

A type of farm animal

 

Name of the vaccine

Grafted head of cattle

(year 2024)

1

horned cattle

"RV-51"

2850

 

In the Abay district, the plan for decontamination of locusts was carried out on 1800 hectares, 1800 hectares of which were carried out. An additional 2,000 hectares were allocated by letter from the region and decontamination works were carried out.

A total of 3,800 ha of decontamination were carried out in the district.

 

 

 

INDUSTRY

"BAST" JSC "Maksut" mining site located in Abay district, until the beginning of the year, the production capacity of ore processed in the mineral processing complex was 400 thousand tons. However, according to the order No. 09-P dated February 21, 2024 of the President of JSC "BAST" S. E. Ryaskov, the enterprise stopped working due to the failure of the grinding mill and the decrease in the quality of the equipment.

On January 23, the akim of the district held a meeting with representatives of "BAST" JSC on the reasons for the temporary stoppage of the work of the "Maksut" mine, the breakdown of its equipment, and future work plans.

The meeting discussed the plan of works to be carried out in the future on the construction of a new mine enrichment copper production complex. If the new complex is built, the production capacity will reach 2.5 million tons per year. The planned start-up period is in the first half of 2027, the cost of the project is 71 billion tenge.

Starting from October 2023, mining of precious metals and rare metal ores of "METALL MINING" LLP is working in Arhat rural district. The actual design capacity is 300,000 tons of ore per year.

In the field of road and highway construction, "Derikar" LLP, an enterprise producing 1.5 tons of Bh II grade asphalt concrete mixture and crushed stone 5-10, 10-20 products with a physical capacity of 1.5 tons per day is working in our district.

In addition, "Kaskabulak LLP" is working in the rural district of Kaskabulak, which produces a total of 130 tons of sheep meat, beef, horse meat, camel meat, sheep wool and camel wool per year.

 

ARCHITECTURE, CONSTRUCTION, RESIDENTIAL UTILITIES AND HIGHWAYS

The total length of the road system in Abay district is 413 km:

of republican importance - 70 km,

of regional importance - 258 km,

of district importance - 85 km.

According to the "Village - Cradle of the Country" program, 3.73 km of average repair of 4 streets and routine maintenance of street lights in 5 streets of 3 villages were carried out in our district by 2024 through 3 projects:

 

Rs

Name

Amount of funds, thousand tenge

Contractor

 

1

"Average repair of Dostyk street in Kaskabulak village 0.7 km".

45,464.0 thousand tenge

"Derikar" LLP

2

"Average repair of Myrza Batyr Street in Kokbay village is 0.580 km".

39,493.0 thousand tenge

"Derikar" LLP

3

"Average repair of Toktamis street in Karaul village is 1.7 km".

97,615.0 thousand tenge

"Derikar" LLP

 

4

"Average repair of Mamai street in Karaul village is 0.750 km".

45,299.0 thousand tenge

"Derikar" LLP

 

 

"Village - Cradle of the Country" program current maintenance of street lights in villages:

 

1

"Maintenance of the lighting of Dostyk street in the village of Kaskabulak"

estimated cost is 14,959.0 thousand tenge;

The contract value is 6,800.0 thousand tenge

"TRIADA-S" LLP, Ust-Kamenogorsk. Repair work has been completed.

 

2

"Maintenance of lighting on Shakarim street in Kokbay village"

estimated cost - 29,631.0 thousand tenge;

The contract value is 17,192.0 thousand tenge.

"TRIADA-S" LLP, Ust-Kamenogorsk. Repair work has been completed.

3

"Maintenance of the lighting of Toktamis street in Karaul village"

  estimated cost is 25,098.0 thousand tenge;

The contract value is 16,106.7 thousand tenge.

4

"Maintenance of lighting on Mamai street in Karaul village"

estimated cost - 22,942.0 thousand tenge

The value of the contract is 15,829.8 thousand tenge . Repair work has been completed.

The repair works have been completed

5

"Maintenance of the lighting of Bekbosynov street in Karaul village"

estimated cost - 18,948.0 thousand tenge.

The contract value is 11,673.2 thousand tenge.

"IP Akshauli", Semey city. Lighting works have been completed.

 

 

Average repair works of roads of regional importance :

  1. "Average repair of Karaul-Arkhat road of district significance, 10 km". The estimated cost is 528,803.2 thousand tenge. Funding for the project was allocated from the regional budget. A tender was announced through the state procurement portal, and the contractor carrying out medium repair works was identified as "Derikar" LLP. The contract value is 488,205.1 thousand tenge. The deadline is the end of October. As of today, 10.0 km of asphalt has been completely laid, and the construction of the roadside is underway.
  2. "Average repair of the access road to Tokhtamys village of regional importance, 10 km". The estimated cost is 638,185.4 thousand tenge. A tender was announced through the state procurement portal, and the contractor performing average repair works was identified as "Semei Roads" LLP. The contract value is 613,760.0 thousand tenge. The deadline is until the end of October . In 07/09/2024, the full amount was allocated from the regional budget. Today, the foundation of the 2.2 km road is ready. 6 techniques. (1 grader, 1 K-700, 3 Kamaz, 1 loader.)

6-chansiman is carrying out materials transportation.

 

Projects and works to be implemented in 2024

 

  1. Painting Abai's picture on the wall of a multi-storey residential building in Karaul village. The estimated cost is 5,668.9 thousand tenge. Funding for the project was allocated from the local budget. A tender was announced through the state procurement portal, and the contractor carrying out current maintenance works was identified as "OPS and K" LLP. The value of the contract is 5,040,000 tenge . Repair work has been completed.
  2. Current repair of the pedestrian path of Eraly street in Karaul village. The estimated cost is 25,085.0 thousand tenge. Funding for the project was allocated from the local budget. A tender was announced through the state procurement portal, and the contractor performing current repair works was identified as "Magniton" LLP. The value of the contract is 20,533.3 thousand tenge . Repair work has been completed.
  3. Current repair of the children's park on Auezov street in the village of Karaul. The estimated cost is 4,685.0 thousand tenge. Funding for the project was allocated from the local budget. A tender was announced through the state procurement portal, and the contractor carrying out current repair works was identified as "ABAY KORKEM" LLP. The cost of the contract is 2,475,000 tenge . Repair work has been completed.
  4. Children's playgrounds were built in 9 rural districts of Abai district. 90,000.0 thousand tenge was allocated from the district budget.
  5. Current repair of the football field in the village of Tokhtamys. The estimated cost is 7,305.0 thousand tenge. Funding for the project was allocated from the local budget. A tender was announced through the state procurement portal, and the contractor carrying out current repair works was identified as "Interstroysoyuz" LLP. The value of the contract is 5,112.9 thousand tenge . Repair work has been completed.
  6. " Maintenance of Central square avenue, Karaul village ". The estimated cost is 92,375.6 thousand tenge. Funding for the project was allocated from the regional budget. A tender was announced through the state procurement portal, and the contractor performing current repair works was identified as "Kachestvo-Stroy Remont" LLP. The contract value is 78,400.0 thousand tenge . Repair work on December 1.
  7. Total estimated cost of "current repair of heating boiler No. 2 and heating network in Karaul village" is 72,083.1 thousand tenge. The value of the contract is 42,448.0 thousand tenge. On 16.09.2024, additional contract No. 64-1 was concluded, the value of which is 28,972.3 thousand tenge. The contractor is "Universe Group" LLP. The work will be completed by the end of October 2024.
  8. "Construction of a sports module in the village of Kokbay". The estimated cost is 521,264.0 thousand tenge. In 2023, 359,449.0 thousand tenge was allocated and used. Today, the construction and roofing works of the administrative and residential building have been completed. Roofing of the hangar part of the sports hall is underway. The work will be completed in December 2024. LLP Contractor "Gradstroyservis" LLP.
  9. "Construction of a children's camp located in the village of Kengirbai Bi, Abay Region, Abay Region" The customer is the Construction Department of Abay Region. The estimated cost is 428,601.0 thousand tenge. Today, the walls of the camp building are built, the roof is covered, and the inner walls are built. Bricklaying of the facade is in progress. The contractor is "Gradstroyservis" LLP.
  10. "Renovation of the water pipeline of the village of Kaskabulak" Estimated cost is 595,027.0 thousand tenge. The value of the contract is 513,915,000 tenge, the allocated funds are 386,132,000 tenge in 2023, and 44,000,000 tenge in 2024. Currently, the construction of the pumping station is underway. The term of construction works under the contract: June 2023 - October 2024. The contractor is "Universalstroyservice" LLP.
  11. "Renovation of the water supply system of the village of Arhat". The estimated cost is 759,817.0 thousand tenge. The contract value is 707,878.7 thousand tenge. 100,000,000 tenge was allocated for September 2024. At present, 7.5 km of water pipeline has been laid. Construction period: July-October 2024 - May-August 2025. The contractor is Karat-Z LLP.
  12. "Construction of block-module station in Burili settlement". 15,000.0 thousand tenge is provided from the regional budget. However, considering the price increase in 2024, the station installation works amounted to 23,732.0 thousand tenge. The contract value is 19,039.9 thousand tenge. The station is currently being connected. The contractor is "Royal Invest-2017" LLP.
  13. " Development of the development scheme (simplified version of the Master Plan) of Karaul village, Abay district, Abay region ." The estimated cost is 23,934.9 thousand tenge. The contract value is 21,541.5 thousand tenge. A public hearing was held on September 30, 2024, and the materials are being prepared to be sent for examination. The deadline is December 2024. Contractor "SK RAOL "INVEST" LLP.
  14. " Development of the development scheme (simplified version of the Master Plan) of the village of Borili, Abay district, Abay region". The estimated cost is 23,934.9 thousand tenge. The contract value is 21,541.5 thousand tenge. A public hearing was held on September 30, 2024, and the materials are being prepared to be sent for examination. The deadline is December 2024. The contractor is "Bakyt tani" LLP.
  15. "Construction of external lines of electricity supply and water supply of Sarjal village dispensary". The estimated cost is 41,944.0 thousand tenge. The contract value is 40,265.8 thousand tenge. Works have been completed. The contractor is "SKB CONSTRUCTION" LLP.
  16. "Construction of external power supply and water supply lines of Medeu village medical center". The estimated cost is 35,780.0 thousand tenge. The contract value is 34,232.5 thousand tenge. Works have been completed. The contractor is " Stroy Company 2017" LLP.
  17. "Construction of external lines of electricity supply and water supply of Orda village medical center". The estimated cost is 36,567.0 thousand tenge. The contract value is 35,069.8 thousand tenge. Works have been completed. The contractor is " Stroy Company 2017" LLP.

Connecting the electricity network to farms

Wintering "Zhanibek" of "Amangel" SH belonging to Arhat rural district; SHK "Nurbol" wintering "Kopa", SHK "Zhianshora" wintering "Shokpartas"; "Kabanbay" winter farm "Akbastau"; "Sertek" winter farm "Sertek"; SHK "Toka" winter "Toka" k VL-10kV L-1 PS-35/10kV "Zhananur"

Documents for connection to the electrical network of the facilities "Saulet" under the rural district of Toktamis Budan, "Nurzhan Zhagypbai" in Zhagipbay, "Nurzhan Toleubai" in Toleubai VL-10kV L-2 PS-110/35/10kV "Bestamak" " JSC and "Chygysenergotrade" JSC institutions were held. Today, an agreement was signed between the farm owners and the establishment of Shygysenergotrade JSC.

  1. Kokbay rural district, 12 farms - the customer of the facility "SKO Energetica and TUKSH Administration" signed a contract with the contractor "NKO" LLP on August 17, 2021 for 238,555.9 thousand tenge. According to the contract, the performance of the work is specified as 3 months. That is, it was supposed to end in December 2021. The facility was commissioned in 2022. Today, work is being carried out to transfer from the balance of the Department of Energy and Housing Utilities of Abay Region to the balance of the Department of Architecture, Construction, Housing and Utilities, Passenger Transport and Highways of Abay District. Connection to the electricity network will be completed in October 2024.
  2. Kokbay rural district 31 farms - according to the form, the client "Energy and Housing and Communal Management of East Kazakhstan Region" MM, the contractor - "NKO" LLP signed a contract for 560,986.7 thousand tenge on August 17, 2021 . According to the contract, the duration of the work is 9.5 months. That is, it was supposed to end in October 2022. This work was performed by an additional contractor - United Energy Service Company JSC. Today, the facility is up and running, but the system is down due to issues. Therefore, according to the warranty, the contractor is carrying out repair work.

 

Housing construction.

Rs

Village name

Years of building

 

2020 year

2021 year

2022 year

 

2023 year

1

 

Karaul village

 

32 apartments

 

32 apartments

 

32 apartments

 

22 apartments

 

Kaskabulak, Sarzhal, Kokbay, Kundizdy, Kenghirbay-bi

 

 

 

20 apartments

 

In particular, 16 - children left without parental care, 55 - large families, 45 - people belonging to socially weak groups of the population, 17 - budget employees, 5 - people whose only housing is in a state of emergency.

There are 299 people in need of housing in Abay district.

In 2024, construction works of 35 1-story, 2-apartment houses (5,550 m2), a total of 66 apartments, are underway in 9 rural districts and 1 settlement.

The funds allocated for the present time are 166,600.0 thousand tenge. In addition, funds from the Samruk-Kazyna fund will be considered. Compared to 2023 (42 apartments), 2024 (70 apartments) is 66% higher.

 

SECTOR OF EMPLOYMENT AND SOCIAL PROTECTION

Rs

Index name

Information

 

 

Special social assistance

32822.6 thousand tenge

114 families (658 people, 418 children)

In particular:

- 64 large families (438 people, 299 children);

- 50 low-income families (220 people, 119 children).

 

 

guaranteed social package

171 children of 93 families from 1 to 7 years of age were paid a guaranteed social package of 5,538 tenge in the amount of 5,089.4 thousand tenge

 

 

Regional map plan and implementation for 2024 in Abai district:

Public work plan 170 people, execution 170 people.

The plan of the social work place is 9 people, the execution is 9 people.

Young people practice plan 23 people , execution 2 3 a person

First work place plan 9 man , performance 9 a person

Silver age project the plan is 30 people , the execution is 31 people .

Generations contract project plan 1 person , execution 1 person.

 

 

Short-term training plan for 23 people, implementation for 23 people.

Grant plan 7 people , implementation 7 people .

2.5% credit plan for young people 20 man , no funds have been provided for this year.

Idle work locations  plan 288 people , implementation 320 a person

Settled translation plan 18 people , execution 28 a person

Bloody plan 5 people , execution 5 people .

Infrastructural projects plan 14 projects 54 work the place , the rival    1 3 project 109 people .

 

 

 

"Green Country" - 92 people

 

FIELD OF EDUCATION

Today, there are 9 secondary schools, 1 general education gymnasium and 1 basic secondary school in the district. 6 kindergartens (including 2 private kindergartens) and 6 small centers. "Specialized school-gymnasium-boarding school named after Abay" and "Abay college" under the regional education department are working.

In addition, 1 privately owned kindergarten with 50 seats has started its work since June 2023 in the village of Toktamis. Coverage of children aged 3-6 years - 786 children. During the academic year, 711 students receive additional education in 2 additional educational institutions (clay and art schools).

Teachers with higher education - 469 (88.8%), special secondary education - 59 (11.1%), teacher-researcher - 70 (13.2%), teacher-expert - 131 (24.8%), teacher- moderator - 183 (34.6%), teachers - 127 (24.0%).

office under the Department of Education of Abay region was opened and started its work in the left wing of the General Secondary School building located in the village of Karaul, the district center . 40 million 147 thousand tenge were allocated from the regional budget for the opening of the cabinet. Today, 9 special specialists - Montessori, speech therapist-defectologist, pedagogue-psychologist, therapeutic physical therapy, music-rhythm and social teacher - are assigned and working for 33 children aged 0-18 on the list of special education needs.

In 11 schools, 707 students of grades 1-4 are provided with full hot meals regardless of their social status, and 586 students in grades 5-11 are provided with hot meals in accordance with Decree No. 64 of RK dated January 25, 2008, a total of 1293 students are provided with hot meals. The amount of funds reviewed is 101 million 800 thousand tenge.

43,181,000 tenge was allocated for one-time financial assistance on September 1, 2024 on the basis of Resolution No. 64 of the Government of the Republic of Kazakhstan dated January 25, 2008 at the expense of the compulsory education fund. Today, 847 children from socially vulnerable groups, orphans, under care were given 43,442 tenge financial assistance per child, school uniforms, shoes and educational materials were provided.

On the basis of the "Road to School" campaign In the 2024-2025 academic year (for children of low-income families with many children), 980,000 tenge will be provided with bags, school supplies, seasonal clothes, financial assistance, etc. to 142 children at the expense of sponsors. was shown.

For 2024, budget documents for the demand of 368,573.0 thousand tenge were prepared, and 13,474,0 thousand tenge were allocated to 3 schools: 6,184,0 thousand tenge for current maintenance of Sh.Abenov secondary school; 2008.0 thousand tenge, additional 5626.0 thousand tenge are needed for the heating line of Medeu secondary school; 5,282.0 thousand tenge for current repair works of the electrical system of the building of the main secondary school named after Mamai.

For 2024, budget documents for 27,017.0 thousand tenge were made for 9 institutions, 20,000.0 thousand tenge for 2 classrooms (physics, biology) and 10,000.0 thousand tenge for the physics classroom of Kokbay secondary school were considered. In general, 77,239.0 thousand tenge funds were allocated to the education sector of the district this year for current repair works of schools. According to Clause 5 of the Law on Education of the Republic of Kazakhstan, current repair works of heating systems, classrooms, sports halls, school canteens, libraries of all educational institutions have been completed in preparation for the new 2024-2025 school year.

For the new academic year, 13 million 993 thousand 744 tenge funds were allocated from the regional education department for 5334 copies, and a complete request was made for insufficient textbooks. The library of the "M. Auezov secondary school" was transferred to a new room, modified and fully equipped with modern resources.

250 million tenge was allocated from the "Kazakhstan People's Support Fund" of KMM "Karaul Gymnasium of JBB". Modern laboratories, modernized classrooms, interactive boards and 26 classrooms, workshops were equipped with these large funds, and new art and television studio classrooms were opened.

 

at "Abay College" , the number of graduates this year is 62. 23 teachers work in the college.

Today, 85 places have been provided in the college according to the state order, and they have been fully implemented.

      

In this academic year, 6 specialties are taught at the college.

  1. Mechanization of agriculture
  2. Welding work
  3. Engineering technology (by types)
  4. Veterinary
  5. Tourism
  6. Use of buildings and structures.

 

The balance of the college has an administrative building, a dormitory for 36 people, parking for 4 cars (box), training workshop.

3 units are included with agricultural machinery ("MTZ - 82" - 2 units, "DT - 75" - 1 unit).

 

HEALTHCARE FIELD

Medical assistance by district:

-1 central hospital;

-1 consultation-diagnostic clinic;

-5 medical clinics;

- 3 medical centers;

- There is 1 FAP.

The number of highly educated doctors is 34.

Middle generation medical workers - 105.

2023 year Be careful 6 to OAA doctor came 2024 year Be careful 3 to OAA doctor came Cadre shortage decrease is noticeable. 2023 year Be careful OAA for of doctors shortage 8 the doctor formed. 2024 year Be careful RB for of doctors shortage 3 the doctor constitutes his inside resuscitator-1, surgeon-1, psychiatrist-narcologist-1.

2023 year Be careful district hospital creditor debt free finished. One to the resident per KTS 2023 -3015.32 Tenge One of 2024 MTN to resident - 37,58 Tenge KTS growth noticeable current at the time RK A task from the Ministry of Health arrived​​ there rural health care, in particular , small Serves the people RB expenses covering KTS to see about suggestion input must RB is also financial there are no risks .

2024 year Be careful OAA for is important problems solved - Sarjal AA in the village , 2 in the village (Medeu, Horde) construction of AA . 2023 year OA DSB medical of equipment deficiency problem decided , Abai OAA for service of the hospital in history for the first time in Yepu necessary medical equipment buy received. 2023 year the amount - 128 821 033.01 tenge, 2022 with the year compared to amount is 26 690 809.00 Tenge.

 

FIELD OF CULTURE

1 district, 3 rural culture houses and 5 rural clubs, 4 folk theaters, 2 folk song and dance ensembles are working regularly in Abay district. A total of 145 people work there.

124 cultural events were held in 9 cultural centers for 9 months of 2024.

On the occasion of May 18, the International Museum Day, the opening of the exhibition "Kunanbay, the man who became famous in Alashka" was held at the "Zhidebay-Borili" state museum-reserve of Abai, the Ministry of Culture and Information of the Republic of Kazakhstan in Semey, in connection with the 220th anniversary of the birth of the public figure Kunanbay Uskenbayuly. During the event, artists of the folk song and dance ensemble "Kalamkas" performed. The director of the museum U. Sagadiev awarded Toleukhan Cosmonaut Sagidollaul, the best in the field of culture of the Republic of Kazakhstan, the singer of our ensemble, who has been playing the image of Abay for about 30 years, with the "Abai Museum" medal.

On the occasion of the 220th anniversary of the birth of Kunanbai Uskenbayuly and the 75th anniversary of the birth of the singer, musician Zhanibek Karmenov, an art competition of district artists was held in March with the aim of developing national art and culture, forming feelings of patriotism and Kazakh patriotism in the young generation. According to the results of the competition, the winners were awarded with a diploma of the district governor and special prizes.

The 220th anniversary of Kunanbai Uskenaibul, a sage of the field and a historical figure, was held. Theatrical performances on the theme "From Bala Kunanbay to Dana Kunanbay" were shown with the participation of regional artists.

During the event, the key of a 50-seater bus was handed over to the team of the folk song and dance ensemble "Kalamkas" as a special gift of the mayor of Abay region N. Urnakhaev.

 

LIBRARY FIELD

In Abai district, 1 district library, 9 rural libraries, a total of 10 libraries provide readers with books. The total number of staff is 26.5 units.

Book collection - 152519, in Kazakh - 104751.

The renewability of the total book stock is 1.2 percent per cent. The renewal rate of the fund in the Kazakh language was 1.15%.

In the system of libraries named after M. Auezov of Abay district in 9 months of 2024:

171 events were held, 148 of which were offline and 23 were online. was held. The number of people included in cultural events is 408 people.

SPORTS FIELD

In 2024, the number of people engaged in physical education and sports in the district is 5810, which is 41.9% of the total population.

Today there are 27 sports facilities, including: 2 sports complexes, 10 hockey fields, 1 swimming pool, 1 Hippodrome, 13 flat structures.

19 sports halls: 12 school sports halls, 4 sports complex sports halls (wrestling hall, boxing hall, training hall and game hall), 1 sports hall in the building of the old sports school (artistic gymnastics hall) and 2 sports halls in Kundizdy village (wrestling hall and gym). All these sports facilities are available to the public today.

In 2023-2024, a sports module is being built in the Kokbay rural district under the "Village - Cradle of the Country" program. Contractor: "GradStroyService" LLP. The cost of the project is 521,264 million tenge. Construction period - May-September 2023, 3rd quarter of 2024.

2024 of the year in the district from January to September About 80 events held , participants Number is 2930 man.

Kakitaev Altynbek Serikuly from Abai District became the first World Champion in Surdo Judo.

Between February and May, a sports competition was held among civil servants of Abay region in 7 sports (Kazakh wrestling, billiards, swimming, table tennis, togizkumalak, volleyball and mini-football). The district team took 2nd place overall.

9 sports events of "Ashamay" national sports dedicated to the 220th anniversary of Kunanbai Uskenbayuly were held. (group race, horse race, alaman race, kukpar, rope training, jambi shooting, getting tenge, translation, Kazakh wrestling, bull wrestler and camel wrestler).

On June 17-21, 2008-2009, 2010-2011 events dedicated to the memory of "Honored sports figure of the Republic of Kazakhstan" Azamat Sain. An open regional boxing tournament was held among teenagers.

 

YOUTH POLICY

A hall with 120 seats and a recording center are working in the communal state institution "Youth Resource Center".

The budget of the Youth Center for 2024 is 37 million 603 thousand tenge, of which 4 million 510 thousand tenge were allocated for the implementation of youth policy.

According to district statistics, there are a total of 4428 people aged 14-35.

In the implementation plan of the state youth policy for 2024 of the municipal state institution "Youth Resource Center" of Abay district, " Development of youth organizations", " Volunteer orientation", " Work with families ", " Increasing the capacity of the youth resource center ", " Prevention of addiction " and " Working youth" A total of 90 measures are included in the areas of " coverage ".

Today, according to the implementation plan of the state youth policy, 72 events, 33 unplanned events and 1 regional event "Dear young bride-2024" were held among the youth of the district.

 

PUBLIC ORDER

According to the results of the work of the Abai district police department for the 9th month of 2024, 19 crimes were registered and 86.7 percent were solved. Compared to last year, the number of crimes was reduced by 11 crimes.

 As for the types of crimes, according to the results of 9 months of 2024, 5 serious crimes were registered and solved 100 percent.

6 cattle thefts out of 19 crimes this year. In order to prevent cattle theft, in 2024, 7 meetings were organized with the residents of the district, and a proposal was made to organize cattle herding and install a GPS device for horses. Currently , 34 farm owners and 20 district residents have installed this device on their horses.

        Explanation work was carried out with the governors of rural districts and heads of farms on wearing reflective tapes with traffic lights at night.